GEOTECHNICAL INVESTIGATION FOR PROPOSED CONCTRUCTUION OF “ HIGH LEVEL NEW BRIDGE ALONG WITH ITS APPROACHES ACROSS RIVER ZUARI”, AT BORIM ON (NH-566), GOA
Name of Client – Technogem Consultants Pvt.Ltd.
Project Cost – 15.14 Lakhs
Project Duration –Oct 2017 To Dec 2017